Short Flowline Negro
Short Flowline Negro
23 %OFF
Short Flowline Negro
Short Flowline Negro

Short Flowline Negro

Troy Lee Designs

$425.000
245786031
245786032
245786033
245786034
245786035
245786036
Guía de Tallas

Envío gratis compras superiores a $299.900 🚚

HOME MOBILE.jpg__PID:91bbf079-ba1e-4d71-85e6-150c50581728
Los pantalones cortos de trail Flowline están dirigidos al ciclista de montaña entusiasta con características minimalistas, pero con la calidad, el ajuste y la sensación que esperas de Troy Lee Designs.
Los pantalones cortos de trail Flowline están dirigidos al ciclista de montaña entusiasta con características minimalistas, pero con la calidad, el ajuste y la sensación que esperas.

Características

  • Montar en forma
  • Montar en forma
  • Tejido elástico mecánico certificado Blue Sign
  • Tejido elástico mecánico certificado Blue Sign
  • Forro de malla de aire TLD con almohadilla
  • Óptimo 2 bolsillos profundos para las manos
  • Ajustadores de cintura del mismo tejido
  • Cremallera con cierre a presión.

Find Your Perfect Fit

SizeBust (inches)Underbust (inches)
XS30-3230-32
S32-3432-34
M34-3634-36
L36-3836-38
XL38-4038-40
XXL38-4038-40

Instock ready for delivery

Fast shipping in 2 hours

Dedicate 24/7 support

What Our Customers Say

Sarah Thompson

I absolutely love the Curve Energy Longline Bra! It provides the perfect balance of support and style for my workouts. The trendy design and comfortable fit make it a winner for me.

Emily Rodriguez

The Curve Energy Longline Bra has become my go-to for low-impact activities. The adjustable straps and four-way stretch fabric ensure a personalized fit and freedom of movement.

Jessica Patel

I can't get enough of the Curve Energy Longline Bra. The cropped length and flattering design make me feel confident and empowered during my workouts.

Olivia Lewis

The Curve Energy Longline Bra is a must-have in my workout wardrobe. The combination of comfort, support, and style is unbeatable. I feel amazing every time I wear it!

BFCM Hot Deal